Mount Construction was contracted by NJDOT to remove and install 122 cathodic protection pile jackets under the Rt 37 Tunney Bridge. The scope also included concrete repairs to several of the pier caps. Mount was able to utilize its marine fleet to tackle this difficult, water based project successfully. Mount Construction partnered with the NJDOT to overcome some material obstacles to bring this project in on time and within budget.